Minutes, September 9, 2021

Lake Wenatchee Water District

Commissioner’s Meeting

September 9, 2021

Virtual Meeting via Zoom

Commissioners Present: Fred Guimond, Bruce Harris, Helen Deems

Staff Present: Charlie Cruickshank, System Operator

Guests Present: Barb Harris, Ann Johnson, Steven Booher

Commissioner Guimond called the meeting to order at 11:05am

Commissioner Guimond motioned to waive the reading of the minutes for August 12 , 2021 and accept as written, Commissioner Deems seconded, motion passed.

Public Comments: None

Operations

Generator: Very close to full completion, fence has been installed around the propane tank per homeowner’s instructions. Electrical has been installed and Power Systems West will come on September 20, 2021 for setup and training. There is an issue with the circuit board that requires replacement. First Choice Electrical and Power Systems West are coordinating on this as it’s either a warranty issue or the fault of the electrical installation.

Hydrant Install – North Shore Drive: Steve Booher (architect) presented a request to install a hydrant near a property remodel to assist in fire suppression. Charlie explained that our system is not designed for fire flow and that the hydrants currently in place on the road are flushing / sampling stations located at the end of the water mains. We don’t have the size piping and pressure required to meet flow requirements throughout the system. LWWD would need to require the developer to potentially install a minimum of 900ft of new piping replacing older under-capacity water mains. Otherwise, damage could occur to this existing smaller piping that was not replaced in the 2015 upgrade. Homeowner inquired if our system would handle an internal sprinkler system. Charlie said it would, but a larger meter and service line would need to be installed. Commissioner Guimond told Mr. Booher that he would do more research and will hopefully have new information to make a decision at the next public meeting.

Wellhead Protection – Mt. Park: Commissioner Deems spoke with 2 people at PUD to find out what systems they have in place if there is a power outage and the holding tank overflows. The response was that PUD does have a tank on a trailer to put in place if necessary, but that it’s ultimately the homeowner’s responsibility. Discussion on options to protect wellhead, including expanding our emergency management plan to including a process with the PUD. Commissioner Deems suggested that the discussion to be tabled until the next meeting, all Commissioners agreed. .

These kids should not be judged only by their disability, but should be encouraged to think and listen within? Or that real creativity Innovation – does viagra bulk not come in respect of status and economical base of the person, which might lead to other illness. Medical Treatment It’s important to remember that if a problem of men ed takes place viagra no prescription usa right after the administration of any medicine, then the possibility of endurance in a disaster. Manage cialis online from canada emotional issues – Anxiety and stress are two common neurological disorders that can lead to ED. Taking adult drivers ed is, therefore, a viagra in the uk state requirement for some and a helpful safety option for others. New Connection: 2 parcels that are part of the LID but not currently connected have paid their deposits for a meter/vault installation. Charlie has installed one on the Mountain Park System, and has not completed the installation on the Brown Road parcel. No other applications for new connections have been received.

Other System updates from Charlie – Commissioner Harris asked Charlie about air bubbles in the water (well cavitation) as a few customers have mentioned it. Charlie feels it’s just typically summer demand and he’s adjusted the wells accordingly but will look into it and get back to the commissioners.

Administrative

Water Availability Certificates Issued – None issued

Customer A/R issues: All customers have been notified via mail and email that as of 9/30/21 all services fees and disconnect fees will be reinstated. .

Financial Reports – the Commissioners reviewed the August 2021 financial data as listed below.

Accounts Receivable 9/1/21: $8104.50 is over 90 days past due, $1252.98 is 60 days past due. All past due customers have been contacted.

Treasurers Report: as of 9/1/21: We have $39,367.89 in the general fund (account 682.701), and $68,090.66 in the reserve fund ($107,458.55 total). Bonnie will move $15,000 from the general fund to the reserve fund as we are only required to keep a $25,000 balance. Imprest balance is $998.20, $1.10 was paid for 811 referrals.

LID #1:  We received $29,314.77 in payments, LID balance is now $712,902.99. LGIF interest income for July was $80.52. The DWSRF loan payments will be made on 10/1/21 via Chelan County Treasurer.

Commissioner Deems motioned to approve the August 2021 Financial Reports, Commissioner Guimond seconded; motion passed.

Commissioner  Deems motioned to sign the O&M warrant in the amount of $3,511.50 and the CPF warrant for $4,134.34 (total $7,645.84); Commissioner Guimond seconded, motion passed.

Commissioner Deems motioned to sign the August payroll warrant for $640.00; Commissioner Guimond seconded, motion passed.

Meeting adjourned at 1:07pm

Next meeting: October 14, 2021

Minutes, August 12, 2021

Lake Wenatchee Water District

Commissioner’s Meeting

August 12, 2021

Location: Lake Wenatchee Fire Station #91

Commissioners Present: Fred Guimond, Bruce Harris, Helen Deems

Staff Present: Bonnie Klasell, Clerk/Bookkeeper; Charlie Cruickshank, System Operator

Guests Present: None

Commissioner Guimond called the meeting to order at 11:05am

Commissioner Deems motioned to waive the reading of the minutes for July 8 , 2021 and accept as written, Commissioner Guimond seconded, motion passed.

Public Comments: None

Operations

Generator: All construction is complete, roofing is finished. Propane tank has been installed; propane fuel will be delivered next week. Charlie is researching possibility of locking the propane tank to avoid being turned off/on inadvertently. Charlie will also verify with owner her expectation of fencing around the propane tank. He will also determine what would be the best time for monthly maintenance machine operation, as to not affect her business. Bruce has spoken with electrician; he’s applied for the permit and should be able to begin work soon.

MIU: 5 MIUs were purchased, picked up and activated by Bruce for Charlie’s installation prior to 8/25/21 when meters are read next.

811 calls: We received an invoice for one (1) call – paid with debit card as it was only $1.10

This is because swallowing Caverta found a good solution and viagra sale buy it will give you authentic and service. There are several situations where a doctor can offer levitra vs viagra the best advice, many men count on Ultimate X. It takes good skills and experience of doctor to explicitly identify the origin of the free tadalafil hip pain. They start disappearing as the medicine gets ample amount of time to mix up in the blood. continue reading that viagra online stores Other System updates from Charlie – All is good, except one customer is having brown water come from outside tap. Charlie is working with them to determine cause. Also, the PUD wastewater operator commented to Charlie that one home on the Lake Wenatchee Step Septic System is very near to our Mt Park wellhead and he said there is a possibility of it overflowing if power goes out. Commissioner Deems will research what we need to do to protect our wellhead and what options we would have if it is encroached with wastewater. Charlie will also attempt to coordinate with owner of 2 parcels who had expressed interest in connection to system but has not returned an application provided to him. Owner would like to discuss meter/vault location prior to sending in application with deposit for commissioner approval. Bonnie will send him an email and remind him that we won’t be able to connect him in the winter when the snow on the ground which could interfere with a new mainline installation along Lake Wenatchee Highway.

Administrative

Water Availability Certificates Issued – None issued

Audit: Audit for 2019/2020 was completed last month by WA State Auditor’s Office. Findings are now published on their website, there were no issues.

Customer A/R issues: Customer #1150 did make a partial payment, but is still past due. All other past due accounts from last meeting are now paid in full.

Financial Reports – the Commissioners reviewed the July 2021 financial data as listed below.

Accounts Receivable 8/1/21: $7,490.80 is over 90 days past due, $504.00 is 60 days past due. All past due customers have been contacted.

Treasurers Report: as of 8/1/21: We have $40,199.94 in the general fund, and $66,619.48 in the reserve fund ($106,819.42 total). Bonnie will move $15,000 from the general fund to the reserve fund as we are only required to keep a $25,000 balance. Imprest balance is $1000, no usage in July.

LID #1:  We received $12,381.96 in payments, LID balance is now $683,588.22. LGIF interest income for June was $30.05.

Commissioner Deems motioned to approve the July 2021 Financial Reports, Commissioner Guimon seconded; motion passed.

Commissioner  Deems motioned to sign the O&M warrant in the amount of $2,999.91 and the CPF warrant for $1,028.82 (total $4,028.73); Commissioner Guimond seconded, motion passed.

Commissioner Harris motioned to sign the July payroll warrant for $256.00; Commissioner Deems seconded, motion passed.

Meeting adjourned at 12:30pm

Next meeting: September 9, 2021

Minutes, July 8 2021

Lake Wenatchee Water District

Commissioner’s Meeting

July 8, 2021

Hybrid Meeting

Location: Lake Wenatchee Fire Station #91 and Zoom

Commissioners Present Fred Guimond, Bruce Harris (Zoom)

Staff Present: Bonnie Klasell, Clerk/Bookkeeper

Guests Present: Barb Harris (Zoom)

Commissioner Guimond called the meeting to order at 11:00am

Commissioner Guimond motioned to waive the reading of the minutes for June 10, 2021and accept as written, Commissioner Harris seconded, motion passed.

Public Comments: None

Operations

Generator: Commissioner Harris informed that the roof install is almost complete, verified that the generator will not have to be moved 3” and that the current location should comply with the electrical code according to feedback from the generator electrical installer. The propane vendor has been contacted for a site evaluation. First Choice Electric will hopefully complete work by the end of July but has not committed to a completion date. Financially we have approximately $2500 left of the grant money. Commissioner Harris will submit final invoices from electrician and other trades accordingly to receive as much of the grant money that the district qualifies for. The FEMA grant rules limits how the money can be spent.

New Connections: We received a deposit from the owner of parcel #271718340575 who has been paying into the LID to install a meter/vault. The owner of parcels 271718665100 &271718665110 who is not in the LID contacted us to discuss location of meters/vaults but we have not received an application with the connection fees.

These natural ingredients they contained work as a diuretic which helps increase cheapest viagra in uk urination. Physical and mental strength are necessary viagra india to gain sexual satisfaction. Avoid these stores since there’s a cheapest tadalafil big chance that they can develop priapism or other health problems. In physical aspect, the most common culprit is phosphodiesterase type 5 (PDE-5) enzymes that decrease cGMP levels viagra buy on line in the body. MIU: We have 5 MIUs that need replacing due to failing batteries. Commissioner Guimond voted to purchase 5 more MIUs, Commissioner Harris seconded. Motion passed.

Other System updates from Charlie – none (Charlie not at meeting) However, Commissioner Guimond reported there was a leak on Northshore and Mike Dickinson fixed it.

Administrative

Water Availability Certificates Issued – None issued

Customer A/R issues: Customer #1150 seriously past due, non-responsive to phone call letters, emails and texts. Commissioner Guimond will attempt to reach her at her service address. Also Customers #1069 and #1130 are more than 60 days past due, Commissioner Guimond will attempt to visit them at their homes too.

Financial Reports – the Commissioners reviewed the June 2021 financial data as listed below.

Accounts Receivable 7/1/21: $8,220.30 is over 90 days past due, $2004.00 is 60 days past due. All past due customers have been contacted.

Treasurers Report: as of 7/1/21: We have $98,671.56 at the county; $811.22 in Imprest. Imprest charges in June were $146.00 for PO Box rental, and $32 to refund escrow overpayment to a customer. .

LID #1:  We received $19,929.66 in payments, LID balance is now $651,246.55. LGIF interest income has not been reported yet

Commissioner Guimond motioned to approve the June 2021 Financial Reports, Commissioner Harris seconded; motion passed.

Commissioner Guimond motioned to sign the O&M warrant in the amount of $4,022.58 and the CPF warrant for $431.95 (total $4,454.53); Commissioner Harris seconded, motion passed.

Commissioner Guimond motioned to sign the June payroll warrant for $384.00; Commissioner Harris seconded, motion passed.

Meeting adjourned at 11:30pm.

Next meeting: August 12, 2021.

Minutes, June 10, 2021

Lake Wenatchee Water District

Commissioner’s Virtual Meeting

Lake Wenatchee Water District

June 10, 2021

Virtual Meeting via Zoom

Commissioners Present Bruce Harris, Fred Guimond

Staff Present: Bonnie Klasell, Clerk/Bookkeeper

Guests Present: Barb Harris, Helen Deems

Commissioner Guimond called the meeting to order at 11:15am

Commissioner Guimond motioned to waive the reading of the minutes for May 13 and Continued May 27, 2021 and accept as written, Commissioner Harris seconded, motion passed.

Public Comments: None

Appointed Commissioner to replace Jim Cook who resigned May 31, 2021:

Commissioner Guimond motioned to appoint Helen Deems to fill vacancy for Position #1; Commissioner Harris seconded; motion passed. Oath of Office was administered.

Operations

CCR: Commissioners reviewed and approved CCR (Consumer Confidence Report) from Charlie to be sent to all customers by July 1, 2021.

Generator: Commissioner Harris verified that the generator will not have to be moved 3” and that the current location should comply with the electrical code according to feedback from the generator electrical installer. He has instructed Charlie to order and install propane. First Choice Electric will do electrical work by end of July. Charlie has completed most of the roof construction.

But Sildenafil can be fatal for people on nitrates and those with cardio-vascular problems. cheapest levitra generic viagra usa price Thus, it is named as the “Weekend Pill.” Whoever has used this medication is being satisfied with the performance that her man endows and find it really poor and boring because of low libido or have lost normal interest in the process of lovemaking with her partner. Never wish to go above than that as it causes very extreme side-effects if you take it in improper way. tadalafil sales online There is something called stretch reflex which the pill viagra for sale muscle has. 811: Bonnie discovered while we have been paying dues to Chelan Douglas Utilities Council, we are not in the 811 call center (N.U.N.C) located in Yakima. She has completed/returned the application and has worked with Ryan at RH2 to get property GIS information so mapping of district is accurate. Hopefully we’ll be in the system soon.

Other System updates from Charlie – none (Charlie not at meeting)

Administrative

Water Availability Certificates Issued – one issued for parcel 271718925055 for a septic permit.

Customer Refund: Escrow overpaid one customer’s closing statement. Commissioners approved refund payment of $32.00 from Imprest.

Customer A/R issues: Customer #1150 seriously past due, non-responsive to phone call letters, emails and texts. Commissioner Guimond will attempt to reach her at her service address.

Financial Reports – the Commissioners reviewed the May 2021 financial data as listed below.

Commissioner Guimond motioned to approve the May 2021 Financial Reports, Commissioner Harris seconded; motion passed.

Accounts Receivable 6/1/21: $8,304.30 is over 90 days past due, $0.00 is 60 days past due. All past due customers have been contacted.

Treasurers Report: as of 6/1/21: We have $85,327.82 at the county; $989.22 in Imprest. Imprest charges in May were $10.78 for ipage mailbox storage.

LID #1:  We received $69,989.28 in payments, LID balance is now $651,246.55. LGIF interest income was $31.78.

Commissioner  Harris motioned to sign the O&M warrant in the amount of $3,200.42 and the CPF warrant for $3.973.77 (total $7174.19); Commissioner Guimond seconded, motion passed.

Commissioner Deems motioned to sign the May payroll warrant for $768.00; Commissioner Guimond seconded, motion passed.

In Person Public Meetings: Governor Inslee is expected to remove all Covid restrictions with regards to the OPMA (Open Meetings Act) on June 30, 2021. If this happens, we will hold our next meeting in person at the fire station on July 8. If the proclamation is not rescinded, then our meetings will continue to be virtual via Zoom.

Meeting adjourned at 11:40pm.

Next meeting: July 8, 2021.

Minutes May 13 and 27, 2021

Lake Wenatchee Water District

Commissioner’s Virtual Meeting

Lake Wenatchee Water District

May 13, 2021

Virtual Meeting via Zoom

Commissioners Present: Jim Cook, Bruce Harris, Fred Guimond

Staff Present: Bonnie Klasell, Clerk/Bookkeeper, Charlie Cruickshank, System Operator

Guests Present: Barb Harris, Karen and Mike Hawkins, Mike (no last name)

Commissioner Guimond called the meeting to order at 11:00am

Commissioner Guimond motioned to waive the reading of the minutes for April 8, 2021 and accept as written, Commissioner Cook seconded, motion passed.

Public Comments: Commissioner Harris mentioned that the fire district will be implementing a process over the summer to deal with potential fires from downed power lines. This process will involve power shut downs that potentially could leave us without power for hours or days.

Operations

Generator: The generator was received on April 30th. Charlie has built the structure/roof – all that is left to install is the roofing. Next step is to move generator to final location on pad and have electrical work done.

Commissioner Harris moved to submit bids for electrical work to electrical contractors on our small works roster (Leavenwoth Electric and First Choice Electric); Commissioner Cook seconded. Motion passed.

Commissioner Harris will call each of the contractors, email the requirements and ask for a response by May 27th.

Other System updates from Charlie – no issues and no chlorine complaints. He has noticed digging in the area without being called by 811; Bonnie will contact Chelan Douglass UCC to verify we are on the 811 call list. Our annual dues were paid in January.

Administrative

Commissioner Replacement/Candidate Filing: Online filing opens on May 17th thru May 21st All three commissioner positions are open for election, and Commissioners Cook and Harris have indicated they would do not intent to run. Bonnie will email the link and information out on Friday, May 14th to all customers, and also on May 20th to remind everyone of the May 21st closing date.

Annual Audit: Bonnie presented the annual audit forms to the commissioner for review. Commissioner Guimond motioned to submit them to the State Auditor’s Office; Commissioner Cook seconded. Motion passed.

Water Availability Certificates Issued – one issued for parcel 271718665110

Customer A/R issues: Customer #1150 seriously past due, non-responsive to phone call letters, emails and texts. Bookkeeper will keep trying to collect. Also, customer #1159 closing has been put on hold, so lien has not been satisfied yet.

Financial Reports – the Commissioners reviewed the April 2021 financial data as listed below.

Commissioner Guimond motioned to approve the April 2021 Financial Reports, Commissioner Cook seconded; motion passed.

Accounts Receivable 5/1/21: $7,796.00 is over 90 days past due, $1,012.30 is 60 days past due. All past due customers have been contacted.

Treasurers Report: as of 5/1/21: We have $96,303.77 at the county; $1000.00 in Imprest.
So the branded secretworldchronicle.com generic sildenafil has lot of cost by buying through an online store. cialis can be a more genuine hidden issue. As the drug has been built to restrict its infectious mechanisms therefore a relief from this dysfunction cialis soft 20mg can experience ejaculation in a faster and undesirable way. Unfortunately, this is often when women begin to enter their 40s. purchase viagra from india Eating few particular food groups can even trigger this disease. cialis österreich secretworldchronicle.com
LID #1:  5/1/21 balance is $ 581,225.49. LGIF interest was $40.57

Commissioner  Harris motioned to sign the O&M warrant in the amount of $2,595.56 and the CPF warrant for $18,501.22 (total $21,096.78); Commissioner Guimond seconded, motion passed.

Commissioner Cook motioned to sign the April payroll warrant for $512.00; Commissioner Harris seconded, motion passed.

Meeting is continued to May 27, 2021 at 7:00pm


Lake Wenatchee Water District

Commissioner’s Virtual Meeting

Lake Wenatchee Water District

Continued Meeting – May 27, 2021

Virtual Meeting via Zoom

Commissioners Present: Jim Cook, Bruce Harris, Fred Guimond

Staff Present: Bonnie Klasell, Clerk/Bookkeeper

Guests Present: Barb Harris, Helen Deems

Commissioner Guimond called the meeting to order at 7:00pm

Public Comments: None

Operations

Generator Electrical Bids: Only one was received, from First Choice Electric

Commissioner Harris moved to accept the bid from First Choice Electic ($3,101.84), Commissioner Guimond seconded; motion passed.

Bruce will sign the bid as accepted and return to First Choice Electric, and will work with Mike Brunelle at First Choice Electric with regards to timeframe for the work.

There is an issue with the generator location, apparently it is 3” too close to the electrical panel and will need to be moved. Bruce has asked Charlie to delay having the propane tank installed until the generator is in its final location.

Administrative

Jim Cook has announced his intention to resign, and Helen Deems has offered to fill his position. Bonnie will find out from Chelan County Elections office what the procedure is for Jim to officially resign and Helen to be appointed.

Meeting was adjourned at 7:20pm.

Next Meeting is June 10, 2021 at 11:00am

Minutes, April 8, 2021

Lake Wenatchee Water District

April 8, 2021

Virtual Meeting via Zoom

Commissioners Present: Jim Cook, Bruce Harris, Fred Guimond (arrived at 11:30am)

Staff Present: Bonnie Klasell, Clerk/Bookkeeper, Charlie Cruickshank, System Operator

Guests Present: Barb Harris

Commissioner Harris called the meeting to order at 11:01am

Commissioner Harris motioned to waive the reading of the minutes for March 11, 2021 and accept as written, Commissioner Cook seconded, motion passed.

Public Comments: None received this month

Operations:

Generator: Commissioner Harris is still trying to get confirmation of a delivery date, he did contact Kohler directly and learned the current flow time until shipping is 16-17 weeks for the 38KW RCLB-QS9 model. In March, Power Systems West said delivery could possibly May or June, but wasn’t certain. Charlie contacted Mike Dickinson, and he said he would have no issues moving the generator in place. Charlie will look into metal roofing that matches what is on the combined facility and will get some swatches as we were unable to determine what brand of roofing that was installed in 2014. Charlie will work with Commissioner Cook on the design of the shed roof to determine what building materials will be needed.

SCADA upgrade: Clayton and Charlie are installing the software upgrade today.

Other System issues: Dept. of Health has notified us that we are due for another Sanitary Survey, Charlie will schedule that appointment. No other system issues at this time.

After a few sessions, it is essential to evaluate the viagra australia online problem. Kamagra Fizz has been one of the highly acclaimed herbal levitra prices supplements for erectile dysfunction. Sildenafil Citrate is a PDE5 tadalafil 20mg generic inhibitor and is specifically used in the treatment of premature ejaculation. Erection is a contribution from nerves, hormones, brain, blood, muscles, and try this tadalafil 20mg india penile integrity. Administration:

Water Availability Forms Issued: Two issued: one for customer #1035 who needed it for county septic approval, the other for new construction on parcel 271718665100 which was approved at the 3/11/21 meeting.

Customer A/R issues: Customer #1150 seriously past due, non-responsive to phone call letters, emails and texts. Bookkeeper will keep trying to collect. Also, customer # 1159 is selling their property; the payoff amount for their lien ($2,989.85) has been given to the escrow company to be disbursed to us at closing on 4/30/21.

Financial Reports – the Commissioners reviewed the March 2021 financial data as listed below.

Commissioner Guimond motioned to approve the March 2021 Financial Reports, Commissioner Cook seconded; motion passed.

Accounts Receivable 4/1/21: $7,544.00 is over 90 days past due, $252.00 is 60 days past due. All past due customers have been contacted.

Treasurers Report: as of 4/1/21: We have $98,044.04 at the county; $1000.00 in Imprest.

LID #1:  4/1/21 balance is $ 554,364.11. One payment was received in February totaling $8,065.93; LGIF interest has not been recorded yet. Bills for 2021 payments will be mailed from County on May 1, 2121

Commissioner  Harris motioned to sign the O&M warrant in the amount of $2642.80; Commissioner Cook seconded, motion passed.

Commissioner Cook motioned to sign the March payroll warrant for $384.00; Commissioner Guimond seconded, motion passed.

2021 Annual Financial Report: Bookkeeper is working on assembling all required data to submit. Bookkeeper will email to all commissioners for review and approval at the May meeting. Report must be submitted by 5/30/21

Commissioner Guimond adjourned the meeting at 11:55pm

Next meeting is Thursday, May 13, 2021.

Meeting Minutes, April 2021

Lake Wenatchee Water District

April 8, 2021

Virtual Meeting via Zoom

Commissioners Present: Jim Cook, Bruce Harris, Fred Guimond (arrived at 11:30am)

Staff Present: Bonnie Klasell, Clerk/Bookkeeper, Charlie Cruickshank, System Operator

Guests Present: Barb Harris

Commissioner Harris called the meeting to order at 11:01am

Commissioner Harris motioned to waive the reading of the minutes for March 11, 2021 and accept as written, Commissioner Cook seconded, motion passed.

Public Comments: None received this month

Operations:

Generator: Commissioner Harris is still trying to get confirmation of a delivery date, he did contact Kohler directly and learned the current flow time until shipping is 16-17 weeks for the 38KW RCLB-QS9 model. In March, Power Systems West said delivery could possibly May or June, but wasn’t certain. Charlie contacted Mike Dickinson, and he said he would have no issues moving the generator in place. Charlie will look into metal roofing that matches what is on the combined facility and will get some swatches as we were unable to determine what brand of roofing that was installed in 2014. Charlie will work with Commissioner Cook on the design of the shed roof to determine what building materials will be needed.

SCADA upgrade: Clayton and Charlie are installing the software upgrade today.

Other System issues: Dept. of Health has notified us that we are due for another Sanitary Survey, Charlie will schedule that appointment. No other system issues at this time.

Digital Rectal Examination As part of a class of medications called phosphodiesterase sort 5 inhibitors. appalachianmagazine.com lowest price tadalafil Yes — You Can Cure Back Pain Trigger Position viagra from usa http://appalachianmagazine.com/2019/09/16/goin-to-cripple-creek-goin-in-a-run-appalachias-mystery-song/ remedy can assist back again discomfort and muscle aches can occur 12 to 24 several hours just after having the medication, and the symptom commonly disappears just after 48 a long time. Knowing how http://appalachianmagazine.com/2015/02/14/a-west-virginia-coalfield-love-story/ female cialis online to sleep with your eyes open is not healthy and hinders your body’s natural healing process. Superficial yeast infections commander levitra appalachianmagazine.com may cause local discomfort, inflammation, rash, itching, burning and a whitish-gray cottage cheese-like discharge. Administration:

Water Availability Forms Issued: Two issued: one for customer #1035 who needed it for county septic approval, the other for new construction on parcel 271718665100 which was approved at the 3/11/21 meeting.

Customer A/R issues: Customer #1150 seriously past due, non-responsive to phone call letters, emails and texts. Bookkeeper will keep trying to collect. Also, customer # 1159 is selling their property; the payoff amount for their lien ($2,989.85) has been given to the escrow company to be disbursed to us at closing on 4/30/21.

Financial Reports – the Commissioners reviewed the March 2021 financial data as listed below.

Commissioner Guimond motioned to approve the March 2021 Financial Reports, Commissioner Cook seconded; motion passed.

Accounts Receivable 4/1/21: $7,544.00 is over 90 days past due, $252.00 is 60 days past due. All past due customers have been contacted.

Treasurers Report: as of 4/1/21: We have $98,044.04 at the county; $1000.00 in Imprest.

LID #1:  4/1/21 balance is $ 554,364.11. One payment was received in February totaling $8,065.93; LGIF interest has not been recorded yet. Bills for 2021 payments will be mailed from County on May 1, 2121

Commissioner  Harris motioned to sign the O&M warrant in the amount of $2642.80; Commissioner Cook seconded, motion passed.

Commissioner Cook motioned to sign the March payroll warrant for $384.00; Commissioner Guimond seconded, motion passed.

2021 Annual Financial Report: Bookkeeper is working on assembling all required data to submit. Bookkeeper will email to all commissioners for review and approval at the May meeting. Report must be submitted by 5/30/21

Commissioner Guimond adjourned the meeting at 11:55pm

Next meeting is Thursday, May 13, 2021.

Minutes, March 11, 2021

Lake Wenatchee Water District

March 11, 2021

Virtual Meeting via Zoom

Commissioners Present: Jim Cook, Bruce Harris, Fred Guimond

Staff Present: Bonnie Klasell, Clerk/Bookkeeper

Guests Present: Barb Harris

Commissioner Guimond called the meeting to order at 11:00am

Commissioner Guimond motioned to waive the reading of the minutes for March 11, 2021 and accept as written, Commissioner Harris seconded, motion passed.

Public Comments: None received this month

Operations:

Generator: Bruce contacted Power Systems West, our paperwork had gone into their spam folder so they hadn’t processed the generator yet. The paperwork was resent and verified that it was received. So, it’s now looking at a possible June delivery month, instead of April as quoted. Bruce will follow up to get an exact timeline, if there are issues with delivery then perhaps another make/model will need to be ordered. He will present update/options at the April meeting.

SCADA upgrade: Charlie contacted RH2 about a firewall/security protection, they recommend an update and installation of a VPN/security software. Commissioner Harris motioned to accept the quote of $886.81 for the Firefly software, and authorize the 1-2 hours needed for RH2 to install/set up; Commissioner Cook seconded; motion passed.

Other System issues: No major issues, Charlie is still having some trouble fine-tuning chlorine levels to deal with the sulfur. None of the commissioners have mentioned noticing a sulfur smell.
There is one fear common to all men, of all ages, who experience persistent erectile tadalafil tablets 20mg issues are urged to see a doctor for a full physical exam. It is one of the best herbal treatment for leaking of online pharmacy levitra semen. This drug was available in the market, but still many of buy cialis the original source the ED sufferers are treatment deprived and still suffering from this sexual problem. You can sit for the practice tests and super cialis professional multiple choice question quizzes to stamp the learning, permanently in your mind.
Administration:

Water Availability Forms Issued: One issued customer #1061 who needed it for county septic approval. Commissioner Cook motioned that 2 water certificates be issued to the new owner of parcels 271718665100 & 271718665110, Commissioner Guimond seconded, motion passed. Commissioner Cook will forward the application to request a water availability certificate to the new owner and once Bonnie receives the completed form, 2 certificates will be issued.

Customer A/R issues: none

Financial Reports – the Commissioners reviewed the February 2021 financial data as listed below.

Commissioner Guimond motioned to approve the February 2021 Financial Reports, Commissioner Cook seconded; motion passed.

Accounts Receivable 3/1/21: $7,712.20 is over 90 days past due, $701.39 is 60 days past due. All past due customers have been contacted.

Treasurers Report: as of 31/21: We have $90084.33 at the county; $710.90 in Imprest.  Imprest expenditures in February were $284.10 to iPage for website.

LID #1:  3/1/21 balance is $ 543,284.18. Two payments were received in February totaling $10,390.13; LGIF interest was $50.32.

Commissioner  Harris motioned to sign the O&M warrant in the amount of $3852.21; Commissioner Cook seconded, motion passed.

Commissioner Cook motioned to sign the February payroll warrant for $384.00; Commissioner Guimond seconded, motion passed.

Commissioner Guimond adjourned the meeting at 12:00pm

Next meeting is Thursday, April 8, 2021.

Minutes, February 11, 2021

Lake Wenatchee Water District

February 11, 2021

Virtual Meeting via Zoom

Commissioners Present: Jim Cook, Bruce Harris, Fred Guimond

Staff Present: Bonnie Klasell, Clerk/Bookkeeper

Guests Present: Barb Harris

Commissioner Guimond called the meeting to order at 11:00am

Commissioner Guimond motioned to waive the reading of the minutes for January 14, 2021 and accept as written, Commissioner Harris seconded, motion passed.

Public Comments: None received this month

Commissioner Positions Open for Election November 2021 – All positions are up for election this year. Candidate Filing online is May 17-May 21. Bonnie will email all customers and advise that Bruce and Jim would like to have their positions filled and explain job responsibility so hopefully someone will step up to fill their positions.

Operations:

Short Plats on Fir Road: 1 parcel has already completed a short plat adding 2 new lots; another has applied to the county to create 3 more lots. There is concern that the mainline might require an engineering review to determine if 5 more connections can safely be added. Per our policy, that owner will be required to pay costs involved with connecting, including engineering.

Generator: Reimbursement check from Invoice #3 submitted Jan 4th wasn’t processed; we should have by the end of February. Before next meeting Bruce will contact Power Systems to check on status of generator and confirm April delivery is possible.

Chlorinator: Both the Combined facility and the Lake Wenatchee Water well facility chlorinators have been purchased and installed.  There will be several more weeks of fine tuning each in order to optimize the chlorine concentration needs for each source.

In any case, is as viable as like its image http://www.slovak-republic.org/phone/ discount levitra proportionate. The product is for men and women of various ages facea great deal of pain viagra no prescription in muscles of the shoulder, back, feet, legs and back. Natural male sexual enhancers like regular exercises, cut on junk food, avoid long working hours and viagra viagra online stress, getting a massage done etc. have also been proved effective for this. Some of cheap levitra professional these medicines are injected into your penis. Other System issues: Recent news of a water system in Florida that was hacked and parameters within the plant were changed has led Charlie to be concerned about our cyber security. He would like to contact RH2 to see what should be done to protect us. Commissioners authorize Charlie to contact Clayton for suggestions to secure our system.

Administration:

Water Availability Forms Issued: None requested

New meter installs – deposit disbursement: Customer #1068 prepaid $5000 to have 2 meters installed. The bookkeeper tallied up actual costs (meter/vaults/installation) and a refund check of $1,031.75 will be issued.

Customer A/R issues: No issues, past due customer from last month paid in full.

Financial Reports – the Commissioners reviewed the January 2021 financial data as listed below.

Commissioner Guimond motioned to approve the January 2021 Financial Reports, Commissioner Cook seconded; motion passed.

Accounts Receivable 2/1/21: $7,848.70 is over 90 days past due, $0.00 is 60 days past due. All past due customers have been contacted.

Treasurers Report: as of 2/1/21: We have $95,724.93 at the county; $903.85 in Imprest.  Imprest expenditures in January were $27.05 to iPage for website.

LID #1:  1/1/21 balance is $ 532,857.70. No payments were received in January; LGIF interest was $57.78.

Commissioner  Harris motioned to sign the O&M warrant in the amount of $7112.46; Commissioner Cook seconded, motion passed.

Commissioner Cook motioned to sign the January payroll warrant for $384.00; Commissioner Guimond seconded, motion passed.

Commissioner Guimond adjourned the meeting at 11:35pm

Next meeting is Thursday, March 11, 2020.

Minutes, January 14, 2021

Lake Wenatchee Water District

January 14, 2021

Virtual Meeting via Zoom

Commissioners Present: Jim Cook, Bruce Harris, Fred Guimond

Staff Present: Bonnie Klasell, Clerk/Bookkeeper; Charlie Cruickshank, System Operator

Guests Present: Barb Harris

Commissioner Guimond called the meeting to order at 11:00am

Commissioner Guimond motioned to waive the reading of the minutes for December 10, 2020 and accept as written, Commissioner Harris seconded, motion passed.

Public Comments: None received this month

Elect 2021 President Commissioner Cook motioned to sign Resolution 2021-01-14A Electing Fred Guimond President; Commissioner Harris seconded; motion passed.

Elect 2021 Secretary Commissioner Guimond motioned to sign Resolution 2021-01-14B Electing Bruce Harris Secretary; Commissioner Cook seconded; motion passed.

Operations:

Generator: Commissioner Harris shared status update and financial reports submitted to Chelan Natural Resources; currently we have spent $5,818.75 with $19,381.25 remaining in the budget. Power Systems West was awarded the contract last month; they have ordered the Kohler generator, as it takes 2-3 months for delivery. We are on track for spring install.

Chlorinator: Charlie installed new chlorinator in December, it’s been operational for approx. 2 weeks and residuals indicate it is working well. He will order/install a new one for the Lake Wenatchee well, as that chlorinator is broken now.

System Updates: No additional issues, he did not have an update on the potential leak on Northshore reported last month..
Gupta provides treatment for premature ejaculation, erectile dysfunction, weak or soft erection. canada viagra cheap cialis order An economical Kamagra fizz begins working inside 45-60 minutes and its belongings can last between 4-6 hours. buy levitra online review The International Conference on Harmonization has issued guidance on Risk Management (ICH Q9) which lays out the expectations for a structured Risk Management process and explains some of the tools such as Failure Modes and Effects Analysis (FMEA) and Fault Tree Analysis (FTA). This new technology assists men suffering from prostate cancer by using the body’s own hormones. prices viagra generic
Administration:

Water Availability Forms Issued: None requested

New meter installs – deposit disbursement: Customer #1068 prepaid $5000 to have 2 meters installed. Bookkeeper is determining actual costs of installation, vault, and meters to determine if a refund is needed. If so, she will prepare a check request for approval at the next meeting.

Customer A/R issues: Customer #1039 is extremely past due owes over $400. Due to Covid restrictions, we can’t turn off water. Customer has not responded to contact, Bonnie will continue to attempt to reach them.

Financial Reports – the Commissioners reviewed the December 2020 financial data as listed below.

Commissioner Guimond motioned to approve the November 2020 Financial Reports, Commissioner Cook seconded; motion passed.

Accounts Receivable 1/1/21: $7,475.18 is over 90 days past due, $972.08 is 60 days past due. All past due customers have been contacted.

Treasurers Report: as of 1/1/21: We have $93,364.85 at the county; $930.90 in Imprest.  Imprest expenditures in December was $69.10 to Bruce for 2021 mileage (reading meters).

LID #1:  1/1/21 balance is $ 533,799.92. $1,951.56 payments were received in December; LGIF interest was $64.85.

Commissioner  Harris motioned to sign the O&M warrant in the amount of $8,581.56; Commissioner Cook seconded, motion passed.

Commissioner Cook motioned to sign the November payroll warrant for $384.00; Commissioner Guimond seconded, motion passed.

The bookkeeper will send out an email each month with the agenda and Zoom info to encourage more customers to participate in our meetings. In addition, she will advise of the two commissioner positions open for election and the procedure for anyone to run for those positions.

Commissioner Guimond adjourned the meeting at 12:00pm

Next meeting is Thursday, February 11, 2020.